[Prequalified GC Categories A, B, or C] 19-BS-6312 – Multi Site Controls due 10/25/18

This notification is a courtesy follow up to the strategic sourcing project announcement. All official information pertaining to district opportunities is communicated through BidNet.

This notification is a courtesy follow up to the strategic sourcing project announcement. All official information pertaining to district opportunities is communicated through BidNet.

BID NO.:19-BS-6312

This is an announcement that Denver Public Schools will be hosting a pre-bid/proposal meeting for multi site controls on October 4, 2018 at 2:00 PM Local Time.

All prospective prime bidders are required to attend this mandatory pre-bid conference and inspection of the project site, beginning at 2:00 PM (Local Time) on October 4, 2018, at 1617 S. Acoma St. Street Denver, CO 80223.

Bid/Proposal Due date is October 25, 2018 10:00 AM

The individual who signs in at the pre-bid meeting is whom all future communications (addenda, intent to award etc.) will be sent to related to this project.

Requirements for eligibility to bid
– Bonding Requirements (based on project budget estimates, bonding must cover final dollar amount of bid).
– Must attend mandatory pre-bid meeting and be on time.
– All addendums released by DPS Strategic Sourcing must be acknowledged.
– MUST be currently prequalified with DPS in general contractor category A, B or C.

Project Details:
Scope of work-
Replace various air circulation, components, and multiple sites. Install or replace automated controls at Barrett, Garden Place, Hallett, Teller.

Architect/Engineering Firm-
DLH Architecture

Drawings and Specifications available 9/27/18 at the link below.
https://www.dropbox.com/sh/4ewces3s61r37e4/AAAP9nNKJd6ZEpCukD6Qw3zWa?dl=0

Construction Dates-
Construction Start: 6/1/19
Substantial Completion: 8/1/19
Final Completion: 8/15/19
MWBE Goal Set – 15%

***ALL PRE-BID MEETINGS WILL START PROMPTLY AT THE TIME STATED, ANY VENDOR ARRIVING AFTER THE SCHEDULED TIME WILL NOT BE PERMITTED TO BID***